Specification guide · reviewed July 27, 2026

Fire documentation without the false promises.

A practical guide to NFPA 701 documentation for artificial hedges and living walls: what the test describes, what it does not prove, and what your venue or authority having jurisdiction may need to review.

NFPA 701Method 2 test protocol
On requestProduct-specific documents
AHJ decidesApproval stays with the authority
No blanket certification claims · exact product and configuration required
Artificial living wall installed in a commercial lobby Commercial lobby living wall
IMPORTANT

A test report is evidence, not automatic project approval. The venue, fire marshal, building official, or other authority having jurisdiction decides what documentation is required and whether the submitted product and installation are acceptable.

01 · Scope

What NFPA 701 can—and cannot—tell you

The safest way to specify artificial greenery is to separate the result of a laboratory test from the approval of a finished project.

What the documentation can support

  • That an identified specimen or configuration was tested under a stated method and set of conditions.
  • The measured flame-propagation behavior reported by the laboratory.
  • A reviewer’s comparison between the submitted material and the project requirement.
  • Product selection when the report clearly matches the item being purchased.

What it does not automatically prove

  • That the product is fireproof or cannot burn.
  • That every color, foliage style, backing, frame, adhesive, or field modification is covered.
  • That a venue or authority having jurisdiction must accept it.
  • That the same product is UV-rated, weather-rated, or suitable for every indoor or outdoor application.
02 · Test selection

NFPA 701 and UL 94 are not interchangeable labels

Both may appear in product discussions, but they address different scopes. The project requirement—not marketing language—should determine which documentation you submit.

DocumentWhat it addressesHow to use itDo not assume
NFPA 701Flame propagation of certain textiles and films under specified test conditions.Use the exact report when the venue or project reviewer requests NFPA 701 documentation for the proposed material.Do not describe the product as fireproof or treat the report as universal approval.
UL 94Flammability testing of plastic materials used in parts, devices, and appliances.Use it when the component specification or reviewer specifically requests UL 94 information.Do not substitute it for an NFPA 701 request without written reviewer acceptance.
Project approvalThe complete proposed product, support, mounting, location, and applicable code or venue requirement.Submit the exact documents and installation description before ordering when approval is critical.Do not infer approval from a badge, product nickname, or unrelated report.
03 · Workflow

Use this five-step review process

This sequence reduces late substitutions, rejected submittals, and confusion between a tested material and the final installed assembly.

01

Ask first

Get the venue or reviewer’s written requirement, including the requested standard and any report-age or lab requirements.

02

Name the product

Choose the exact foliage, backing, frame, and intended application. Generic terms such as “fire-rated greenery” are not enough.

03

Match the report

Confirm that the report identifies the proposed product or configuration rather than a visually similar substitute.

04

Submit before purchase

Send the documentation and installation description to the reviewer before final ordering when approval is a project condition.

05

Control changes

Recheck coverage if the foliage, support, backing, adhesive, finish, dimensions, or mounting approach changes.

04 · Submittal checklist

What to include in a useful document package

The goal is traceability: the reviewer should be able to connect the report to the exact product and proposed installation.

01

Exact product identification

Product name, SKU or configuration, foliage type, backing or support, and the supplier contact.

02

Complete test document

The relevant report or certificate, including the test method, specimen description, laboratory, date, and report identifier when available.

03

Installation description

Location, dimensions, support system, substrate, attachment approach, nearby heat sources, and whether the work is temporary or permanent.

04

Reviewer decision

Written acceptance, requested revisions, or conditions from the venue or authority having jurisdiction before installation.

06 · FAQ

Common fire-documentation questions

These answers are intentionally narrow. Project-specific acceptance always belongs to the reviewer responsible for that project.

Does NFPA 701 mean an artificial plant is fireproof?

No. NFPA 701 test results describe flame-propagation behavior under specified test conditions. They do not make a product fireproof or guarantee approval for every project.

Does every Geranium Street product have NFPA 701 documentation?

No. Documentation is available only for applicable products and configurations. Confirm the exact product before relying on a report.

Who decides whether the documentation is accepted?

The venue, fire marshal, building official, or other authority having jurisdiction decides what is required and whether the submitted documentation is acceptable for the project.

Is UL 94 the same as NFPA 701?

No. They are different test standards with different scopes. Use the test documentation specifically requested by the project reviewer rather than treating one standard as an automatic substitute for another.

Does fire documentation prove that a product is suitable outdoors?

No. Fire testing and outdoor durability are separate questions. Outdoor use should be evaluated using the exact product’s UV, weather-exposure, mounting, and maintenance information.

Match the documents before you order the material.

Send the exact product, venue, dimensions, location, and reviewer requirement. Geranium Street will identify the applicable documentation or tell you when the requested coverage is not available.

CallRequest documents