Commercial living wall installation in a corporate lobby
COM.01 — RESOURCE HUB

Commercial resources organized by the decision you are making.

Every specifier, GC, and property manager reaches this hub at a different point. Jump to the stage you are working through — concept, design, submittal, procurement, installation, or closeout records — and pick up the exact resource that moves it forward.

Request a commercial quote
COM.02 — FILTER BY STAGE

Six stages, one hub

This is a resource directory, not a price list. Each stage below links straight to the working pages, guides, and documents relevant to that decision. Nothing here is gated.

STAGE 02 — DESIGN

Plan coverage and appearance

Once the system is chosen, plan how much wall it covers and how it reads. Coverage math and appearance planning happen here, before quantities are locked.

STAGE 05 — INSTALLATION

Handling and mounting

With product on site, installation resources cover handling, attachment, and finishing. California installation is handled by Califauxscapes; availability elsewhere is confirmed per project.

STAGE 06 — RECORDS

Closeout and record retention

At closeout, keep the record of what was actually installed. For a multi-location rollout, that record is what lets a second site match the first without guesswork.

For closeout, retain the approved product identity, the approved sample and finish, the documents submitted for review, the installed dimensions and quantities, ship-to information, and any location-specific exposure or attachment notes. Keeping that set together keeps a repeat order or a second location honest to the original.

COM.03 — DISCIPLINE

Keep the proposed product and the paperwork aligned.

Most review problems come from a mismatch between what was documented and what shows up. Four habits keep a submittal defensible.

01

Name the exact proposed product

Identify the specific product and configuration by name, not a product family, so every document points to the same thing.

02

Record the project condition

Capture interior or exterior exposure, substrate, dimensions, and reviewer requirement — the conditions the product has to suit.

03

Request matching documents

Ask for fire documentation and specifications tied to that exact product and condition, not a generic download.

04

Submit without substitution

Install the product that was documented and approved. A substitution restarts the review the paperwork was built for.

COM.04 — WHAT TO INCLUDE

What to include when contacting Geranium Street

The more of this you send up front, the faster the reply lands on the actual product and configuration for your project.

  • Wall width and height, and the number of walls or runs
  • Interior or exterior exposure and substrate information if known
  • Project city and ship-to information
  • Desired appearance, plus photographs or drawings
  • Any reviewer or venue fire-documentation requirement
  • Schedule and target install window
COM.05 — FAQ

Specifier questions

Start with the product family and project condition. Send dimensions, exposure, substrate information, project city, desired appearance, reviewer requirements, and schedule before asking for a final specification.
No. Fire documentation must match the exact applicable product or configuration. Request the document pack with the proposed product, venue, project address, and reviewer requirement.
No. Current price, availability, quantity breaks, lead time, freight, and samples are confirmed in a project quote.
Keep the approved product identity, sample, finish, documents, dimensions, quantities, ship-to information, and location-specific exposure or attachment notes.

Working on a spec?

Send drawings, dimensions, exposure, and any reviewer fire-documentation requirement, and a project team will reply on the exact product and configuration for your project.

Request a commercial quote Get the Fire Documentation Pack